Pont del More Compound
Program: Residential
Size: 205 m2
Location: Rosselló, Spain
Status: Concept
Time: 2020-2021
The new compound in Rosselló, Lleida has 15 townhouses of 205 m² built with gardens that vary between 54 m² and 224 m².
The houses have large spaces designed for comfort and a private and common community area with a pool. Its exterior design combines the traditional with the contemporary, with the idea of building village houses of the 21st century.
The interior finishes and lighting, give warmth to the spaces designed for different uses during the day.
The construction is made of white concrete panels that guarantee a high constructive quality and a delivery time of the houses of 8 months.
The aerothermal energy system optimizes the production of sanitary hot water and the air conditioning by means of cold / heat air through ducts, being very efficient and generating significant savings in electricity.
Credits:
Director: Xavier Vilalta
Project Leader: Oscar Farré
Project Team: Federico Melis